홈 마곡도시개발 영문> Development Plan> U-City Plan> Frame Work

U-City Plan

Frame Work

Component

Essentially, Magok u-City should feature a ubiquitous infrastructure throughout the entire new-city, and based on this, a total operation center is needed as the physical space to provide and maintain various U-services.

Magok U-City
Magok U-City
Overall operation center Ubiquitous Infrastructure U-service Operating principle
Overall control / Operation space wired, wireless line provide service to residents Actual operation

Overall control / Operation space

Monitoring patrol, emergency status

Provide service operation space

Maintain Major IT equipment

Can be used as the region’s self-governing Building

High speed public network

Video surveillance, network for public administration service

use Utility tunnels

Provide public / private services using ubiquitous infrastructure

Earnings are needed to support operation cost

Response scenario by status

Facility management

Establish the budget and execution

Procedure

Throughout the establishment of a strategic plan and USP, u-City project performs the derivation of service and Magok u-City vision and project analysis, and after the execution design, it is operated as order of establishment and operation

Procedure

Definition and goal of the strategic plan

To efficiently establish the u-City components, , execute "u-City Strategic Planning (USP)" from the city basic plan establishment step to save cost and reduce waste

Definition of the strategic plan

What is "u-City USP ( u-City Strategic Planning)"
Step for establishing the execution plan and determining the strategy and solution for the application of Ubiquitous technology to achieve the future goal of target city and region

Goal of the strategic plan

Goal of the strategic plan

Promotion framework

Through the USP, establish the vision and strategy of u-City, and based on this, derive/design the u-Service, and design the required u-Infrastructure. Derive the project model and operation plan for the successful project.

Strategic plan establishment procedure

Strategic plan establishment procedure